Week 11 Door Installed and Electrical Started


Last week the kitchen door was installed and the electrical work started up again this week. The door has been quite a fiasco and the company is coming back to re-install it because of the horrible install job that was done.

The electrical work is going well. Scott ordered proximity switches for the island and the cabinet next to the sink so we just wave our hand in front of the area where the switch is hidden behind the cabinet and it turn the lights turn on and off.

The granite back splash was supposed to be installed today, but they came with the pieces and realized that they cut some pieces in the wrong direction so it wouldn't match the directional flow of the counter tops. So, they have to go back and re-cut the pieces and hope to re-install it by the end of this week.

In the picture below the light fixtures, dishwasher and microwave are hooked up.